FUT Minna ยท SICT PV Suitability Suite

Electrical Load Analysis of Solar Photovoltaic System Suitability: A Case Study of SICT Building, FUT Minna

Oche Raphael Idoko (Matric No: 2021/1/83232EL)

Supervisor: Prof. Alkali Babawuya

Materials and Metallurgical Engineering, Federal University of Technology, Minna, Niger State

9/13/2026

Severe phase imbalance detected: Yellow phase carries 42.6% of total line current.

Peak Real Demand

24.20 kW

122.2 A @ 220 V

Mean Observed Energy

84.72 kWh

Installed Connected Load

101.1 kW

Diversity factor: 0.24

Dominant Load Driver

Air Conditioning

75.8% of connected load

30.24

PV Array (kWp)

30.24

Inverter (kW)

117.67

Battery (kWh)